← Back to Bedfordshire

Battery storage · United Kingdom

Watling Street, Caddington - Battery Storage

Operator Chiltern Renewables Hockliffe Limited · Owner Encavis AG

Application WithdrawnData checked 16 November 2026Source record dated 2 September 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Watling Street, Caddington - Battery Storage is a battery storage site 4 km south-east of Dunstable, Bedfordshire, United Kingdom. Its planning application (CB/23/03583/OUT) went to Central Bedfordshire on 17 November 2023 and was withdrawn on 18 July 2024. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 51 other energy sites within 10 km, 18 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 4 other sites and 721 energy sites within 40 km for Watling Street, Caddington - Battery Storage

Members see the sites and incidents around this one, and every record behind them.

CHILTERN RENEWABLES HOCKLIFFE LIMITED (13029659), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Co-located with RE)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Chiltern Renewables Hockliffe Limited
Owner
Encavis AG
Location
E/O Watling Street, Adj Horse And Jockey Public House, Caddington, Dunstable, Bedfordshire, LU6, United Kingdom
Planning authority
Central Bedfordshire
Planning application
CB/23/03583/OUT

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CB/23/03583/OUT, with what the planning evidence pack adds for this site.

Every application in Central Bedfordshire · Alerts for applications and incidents near here

  • 17 November 2023 Planning application submitted
  • 18 July 2024 Application withdrawn

None found. The register holds no published incident that names Watling Street, Caddington - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Watling Street, Caddington - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Watling Street, Caddington - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Watling Street, Caddington - Battery Storage?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 2 September 2024.
Where is Watling Street, Caddington - Battery Storage?
4 km south-east of Dunstable, Bedfordshire, United Kingdom (postcode LU6).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).