Battery storage · United Kingdom

Elstree Substation, Hilfield Lane - Battery Energy Storage

Operator Chiltern Renewables Hockliffe Limited · Owner Encavis AG

Application Withdrawn400 MWData checked 16 November 2026Source record dated 25 November 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Elstree Substation, Hilfield Lane - Battery Energy Storage is a 400 MW battery storage site on the edge of Bushey, Hertfordshire, United Kingdom. Its planning application (23/1508/OUT) went to Hertsmere on 14 November 2023 and was withdrawn on 21 November 2024. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 56 other energy sites within 10 km, 7 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 4 other sites and 869 energy sites within 40 km for Elstree Substation, Hilfield Lane - Battery Energy Storage

Members see the sites and incidents around this one, and every record behind them.

CHILTERN RENEWABLES HOCKLIFFE LIMITED (13029659), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
400 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Chiltern Renewables Hockliffe Limited
Owner
Encavis AG
Location
E/O Elstree Substation, Hilfield Lane, Aldenham, Hertfordshire, WD25 8DT, United Kingdom
Planning authority
Hertsmere
Planning application
23/1508/OUT

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/1508/OUT, with what the planning evidence pack adds for this site.

Every application in Hertsmere · Alerts for applications and incidents near here

  • 14 November 2023 Planning application submitted
  • 21 November 2024 Application withdrawn

None found. The register holds no published incident that names Elstree Substation, Hilfield Lane - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Elstree Substation, Hilfield Lane - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Elstree Substation, Hilfield Lane - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Elstree Substation, Hilfield Lane - Battery Energy Storage?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 25 November 2024.
Where is Elstree Substation, Hilfield Lane - Battery Energy Storage?
On the edge of Bushey, Hertfordshire, United Kingdom (postcode WD25 8DT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).