Solar · United Kingdom
Hilfield Solar Farm & Battery Storage Facility
Operator Elstree Green Limited
Revised49.9 MWData checked 16 November 2026Source record dated 1 July 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hilfield Solar Farm & Battery Storage Facility is a 49.9 MW solar farm on the edge of Bushey, Hertfordshire, United Kingdom. Its planning application (21/0050/FULEI) went to Hertsmere on 8 January 2021 and was refused on appeal on 8 April 2024. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 59 other energy sites within 10 km, 44 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Hilfield Solar Farm & Battery Storage Facility changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hilfield Solar Farm & Battery Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 56 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 56 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 110 km | Significant |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 171 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- Elstree Green Limited
- Location
- Hilfield Farm, Hilfield Lane, Aldenham, Hertfordshire, WD25 8DD, United Kingdom
- Planning authority
- Hertsmere
- Planning application
- 21/0050/FULEI
- Appeal reference
- 22/0016/APP
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 21/0050/FULEI, with what the planning evidence pack adds for this site.
Every application in Hertsmere · Alerts for applications and incidents near here
Timeline
- 8 January 2021 Planning application submitted
- 19 November 2021 Planning permission refused
- 21 March 2022 Appeal lodged
- 8 April 2024 Appeal refused
Incidents on the register at this site
None found. The register holds no published incident that names Hilfield Solar Farm & Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Hilfield Solar Farm & Battery Storage Facility had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hilfield Solar Farm & Battery Storage Facility; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Hilfield Solar Farm & Battery Storage Facility?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 1 July 2024.
- Where is Hilfield Solar Farm & Battery Storage Facility?
- On the edge of Bushey, Hertfordshire, United Kingdom (postcode WD25 8DD).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).