Solar · United Kingdom

Tealing Airfield PV

Operator Green Cat Renewables · Owner Green Cat Holdco Limited

Planning Permission Expired31 MWData checked 16 November 2026Source record dated 4 April 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tealing Airfield PV is a 31 MW solar farm 5.7 km north of Dundee, Tayside, United Kingdom. Its planning application (14/00428/FULM) went to Angus on 29 May 2014 and was granted on 11 December 2014. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 39 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 34 other sites and 245 energy sites within 40 km for Tealing Airfield PV

Members see the sites and incidents around this one, and every record behind them.

GREEN CAT RENEWABLES LIMITED (SC277156), active, since 2004. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
31 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Green Cat Renewables
Owner
Green Cat Holdco Limited
Location
Former Airfield, Tealing, Dundee, Angus, Tayside, DD4, United Kingdom
Planning authority
Angus
Planning application
14/00428/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/00428/FULM, with what the planning evidence pack adds for this site.

Every application in Angus · Alerts for applications and incidents near here

  • 29 May 2014 Planning application submitted
  • 11 December 2014 Planning permission granted
  • 11 December 2017 Planning permission expired

None found. The register holds no published incident that names Tealing Airfield PV. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Tealing Airfield PV had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tealing Airfield PV; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tealing Airfield PV?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 4 April 2018.
Where is Tealing Airfield PV?
5.7 km north of Dundee, Tayside, United Kingdom (postcode DD4).