Onshore wind · United Kingdom
Welton Of Creuchies
Operator Green Cat Renewables · Owner Green Cat Holdco Limited
Operational9.2 MWData checked 16 November 2026Source record dated 3 April 2018
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Welton Of Creuchies is a 9.2 MW wind farm 6.3 km north-east of Blairgowrie and Rattray, Tayside, United Kingdom. Its planning application (10/00876/FLL) went to Perth and Kinross on 17 May 2010 and was granted on appeal on 6 July 2012. It has been operating since 23 January 2018. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 12 other energy sites within 10 km, 6 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Welton Of Creuchies changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
GREEN CAT RENEWABLES LIMITED (SC277156), active, since 2004. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 9.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Green Cat Renewables
- Owner
- Green Cat Holdco Limited
- Location
- Alyth, Blairgowrie, Tayside, United Kingdom
- Planning authority
- Perth and Kinross
- Planning application
- 10/00876/FLL
- First operating
- 2018
- Turbines
- 4
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 10/00876/FLL, with what the planning evidence pack adds for this site.
Every application in Perth and Kinross · Alerts for applications and incidents near here
Timeline
- 17 May 2010 Planning application submitted
- 21 March 2011 Planning permission refused
- 29 June 2011 Appeal lodged
- 6 July 2012 Planning permission granted
- 6 July 2012 Appeal granted
- 19 July 2017 Construction started
- 23 January 2018 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Welton Of Creuchies. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Welton Of Creuchies had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Welton Of Creuchies; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Welton Of Creuchies?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 April 2018.
- Where is Welton Of Creuchies?
- 6.3 km north-east of Blairgowrie and Rattray, Tayside, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).