← Back to Angus
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Balnuith Farm, Tealing - Battery Storage

Operator Apatura · Owner Felstead Ford Limited

Awaiting Construction100 MWData checked 16 November 2026Source record dated 11 November 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Balnuith Farm, Tealing - Battery Storage is a 100 MW battery storage site 6.6 km north of Dundee, Angus, United Kingdom. Its planning application (ECU00004887) went to Scottish Government (S36) on 13 November 2023 and was granted on 22 October 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 38 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

APATURA LTD (13948114), active, since 2022. 4 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Balnuith Farm, Tealing - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 349 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool349 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells397 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire540 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
100 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Apatura
Owner
Felstead Ford Limited
Location
Balnuith Farm, Tealing, Dundee, Angus, DD4 0RE, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00004887

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00004887, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 13 November 2023 Planning application submitted
  • 22 October 2024 Planning permission granted
  • 22 October 2029 Planning permission runs out

None found. The register holds no published incident that names Balnuith Farm, Tealing - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Balnuith Farm, Tealing - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Balnuith Farm, Tealing - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Balnuith Farm, Tealing - Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 November 2024.
Where is Balnuith Farm, Tealing - Battery Storage?
6.6 km north of Dundee, Angus, United Kingdom (postcode DD4 0RE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).