Solar · United Kingdom

Field 279M North East of 15 Tealing

Operator Green Power Consultants

Abandoned5 MWData checked 16 November 2026Source record dated 20 October 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Field 279M North East of 15 Tealing is a 5 MW solar farm 7.2 km north of Dundee, Angus, United Kingdom. Its planning application (15/00331/FULL) went to Angus on 20 April 2015 and was granted on 3 November 2015. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 35 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 7 other sites and 236 energy sites within 40 km for Field 279M North East of 15 Tealing

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Abandoned
Operator or applicant
Green Power Consultants
Location
Field 270M North East Of, 15, Tealing, Dundee, Tayside, Angus, DD4 0QZ, United Kingdom
Planning authority
Angus
Planning application
15/00331/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/00331/FULL, with what the planning evidence pack adds for this site.

Every application in Angus · Alerts for applications and incidents near here

  • 20 April 2015 Planning application submitted
  • 3 November 2015 Planning permission granted
  • 5 November 2018 Planning permission expired

None found. The register holds no published incident that names Field 279M North East of 15 Tealing. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Field 279M North East of 15 Tealing had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Field 279M North East of 15 Tealing; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Field 279M North East of 15 Tealing?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 20 October 2017.
Where is Field 279M North East of 15 Tealing?
7.2 km north of Dundee, Angus, United Kingdom (postcode DD4 0QZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).