Solar · United Kingdom
Tealing Solar Energy Park - Phase 2
Operator Sirius EcoDev Limited
Awaiting Construction110 MWData checked 16 November 2026Source record dated 8 April 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Tealing Solar Energy Park - Phase 2 is a 110 MW solar farm 7.3 km north of Dundee, Tayside, United Kingdom. Its planning application (ECU00004882) went to Scottish Government (S36) on 17 November 2023 and was granted on 25 March 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 35 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Tealing Solar Energy Park - Phase 2 changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
SIRIUS ECODEV GROUP LTD (10643742), active, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tealing Solar Energy Park - Phase 2 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1476, House fire reported to have started on solar panels in Carnoustie, 14 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1476 | 2026 | House fire reported to have started on solar panels in Carnoustie | 14 km | Significant |
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 61 km | Minor |
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 123 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 110 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Sirius EcoDev Limited
- Location
- N/O Leyshade, Tealing, Dundee, Tayside, DD4 0PX, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00004882
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for ECU00004882, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 17 November 2023 Planning application submitted
- 25 March 2025 Planning permission granted
- 25 March 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Tealing Solar Energy Park - Phase 2. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Tealing Solar Energy Park - Phase 2 had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Tealing Solar Energy Park - Phase 2; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Tealing Solar Energy Park - Phase 2?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 April 2025.
- Where is Tealing Solar Energy Park - Phase 2?
- 7.3 km north of Dundee, Tayside, United Kingdom (postcode DD4 0PX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).