Tealing Solar Energy Park - Phase 2

Operator Sirius EcoDev Limited

Awaiting Construction110 MWData checked 16 November 2026Source record dated 8 April 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tealing Solar Energy Park - Phase 2 is a 110 MW solar farm 7.3 km north of Dundee, Tayside, United Kingdom. Its planning application (ECU00004882) went to Scottish Government (S36) on 17 November 2023 and was granted on 25 March 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 35 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

SIRIUS ECODEV GROUP LTD (10643742), active, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tealing Solar Energy Park - Phase 2 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1476, House fire reported to have started on solar panels in Carnoustie, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14762026House fire reported to have started on solar panels in Carnoustie14 kmSignificant
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline61 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School123 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
110 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Sirius EcoDev Limited
Location
N/O Leyshade, Tealing, Dundee, Tayside, DD4 0PX, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00004882

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00004882, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 17 November 2023 Planning application submitted
  • 25 March 2025 Planning permission granted
  • 25 March 2028 Planning permission runs out

None found. The register holds no published incident that names Tealing Solar Energy Park - Phase 2. If you know of one, report it (confidential reports are anonymised).

Has Tealing Solar Energy Park - Phase 2 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tealing Solar Energy Park - Phase 2; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tealing Solar Energy Park - Phase 2?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 April 2025.
Where is Tealing Solar Energy Park - Phase 2?
7.3 km north of Dundee, Tayside, United Kingdom (postcode DD4 0PX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).