Planning pack for this site, £295Other options

Battery storage · United Kingdom

Pembroke (The Greenlink Converter Station - Lambeeth Battery Energy Storage)

Operator Sirius EcoDev Limited · Owner Sirius Ecodev (Lambeeth) Limited

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 12 November 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Pembroke (The Greenlink Converter Station - Lambeeth Battery Energy Storage) is a 49.9 MW battery storage site 3.6 km south-west of Pembroke Dock, Pembrokeshire, United Kingdom. Its planning application (23/0857/PA) went to Pembrokeshire on 12 January 2024 and was granted on 16 October 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 41 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

SIRIUS ECODEV GROUP LTD (10643742), active, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pembroke (The Greenlink Converter Station - Lambeeth Battery Energy Storage) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 148 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter148 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire211 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool237 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Sirius EcoDev Limited
Owner
Sirius Ecodev (Lambeeth) Limited
Location
Agricultural Field, E/O The Greenlink Converter Station, E/O The Greenlink Converter Station Off Goldborough Road, Pembrokeshire, SA71 5TR, United Kingdom
Planning authority
Pembrokeshire
Planning application
23/0857/PA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/0857/PA, with what the planning evidence pack adds for this site.

Every application in Pembrokeshire · Alerts for applications and incidents near here

  • 12 January 2024 Planning application submitted
  • 16 October 2024 Planning permission granted

None found. The register holds no published incident that names Pembroke (The Greenlink Converter Station - Lambeeth Battery Energy Storage). If you know of one, report it (confidential reports are anonymised).

Has Pembroke (The Greenlink Converter Station - Lambeeth Battery Energy Storage) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pembroke (The Greenlink Converter Station - Lambeeth Battery Energy Storage); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pembroke (The Greenlink Converter Station - Lambeeth Battery Energy Storage)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 November 2024.
Where is Pembroke (The Greenlink Converter Station - Lambeeth Battery Energy Storage)?
3.6 km south-west of Pembroke Dock, Pembrokeshire, United Kingdom (postcode SA71 5TR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).