Battery storage · United Kingdom
Pembroke Power Station, Pwllcrochan - Battery Storage
Operator RWE Generation UK Plc · Owner Rwe Generation UK PLC
Awaiting Construction350 MWData checked 16 November 2026Source record dated 2 December 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Pembroke Power Station, Pwllcrochan - Battery Storage is a 350 MW battery storage site 3.9 km west of Pembroke Dock, Pembrokeshire, United Kingdom. Its planning application (24/0600/PA) went to Pembrokeshire on 17 September 2024 and was granted on 31 January 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 41 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Pembroke Power Station, Pwllcrochan - Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
RWE GENERATION UK PLC (03892782), active, since 1999. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pembroke Power Station, Pwllcrochan - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 149 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0249 | 2026 | Smoke and fire incident at Battery Box, Pinhoe Road, Exeter | 149 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 211 km | Significant |
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 237 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 350 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- RWE Generation UK Plc
- Owner
- Rwe Generation UK PLC
- Location
- Pembroke Power Station, Pwllcrochan, Pembrokeshire, SA71 5SS, United Kingdom
- Planning authority
- Pembrokeshire
- Planning application
- 24/0600/PA
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 24/0600/PA, with what the planning evidence pack adds for this site.
Every application in Pembrokeshire · Alerts for applications and incidents near here
Timeline
- 17 September 2024 Planning application submitted
- 31 January 2025 Planning permission granted
- 31 January 2030 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Pembroke Power Station, Pwllcrochan - Battery Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Pembroke Power Station, Pwllcrochan - Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Pembroke Power Station, Pwllcrochan - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Pembroke Power Station, Pwllcrochan - Battery Storage?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2025.
- Where is Pembroke Power Station, Pwllcrochan - Battery Storage?
- 3.9 km west of Pembroke Dock, Pembrokeshire, United Kingdom (postcode SA71 5SS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).