Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Pondersbridge Farm, Oilmills Road - Wind Turbine

Operator Whittome Farms

Awaiting ConstructionData checked 16 November 2026Source record dated 2 January 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pondersbridge Farm, Oilmills Road - Wind Turbine is a wind farm 5.4 km south of Whittlesey, Cambridgeshire, United Kingdom. Its planning application (F/YR23/0894/F) went to Fenland on 26 October 2023 and was granted on 21 December 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 34 other energy sites within 10 km, 11 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pondersbridge Farm, Oilmills Road - Wind Turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-2021, Wind turbine catches fire near Thorney in Lincolnshire, 13 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20212022Wind turbine catches fire near Thorney in Lincolnshire13 kmSignificant
EIR-08952018Wind turbine catches fire at Doddington wind farm after storms14 kmSignificant
EIR-12752022Fire damages Siemens Gamesa turbine at French Farm wind farm17 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Whittome Farms
Location
Pondersbridge Farm, Oilmills Road, Huntingdon, Cambridgeshire, PE26 2TR, United Kingdom
Planning authority
Fenland
Planning application
F/YR23/0894/F
Turbines
1, 50 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for F/YR23/0894/F, with what the planning evidence pack adds for this site.

Every application in Fenland · Alerts for applications and incidents near here

  • 26 October 2023 Planning application submitted
  • 21 December 2023 Planning permission granted
  • 21 December 2026 Planning permission runs out

None found. The register holds no published incident that names Pondersbridge Farm, Oilmills Road - Wind Turbine. If you know of one, report it (confidential reports are anonymised).

Has Pondersbridge Farm, Oilmills Road - Wind Turbine had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pondersbridge Farm, Oilmills Road - Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Pondersbridge Farm, Oilmills Road - Wind Turbine?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 January 2024.
Where is Pondersbridge Farm, Oilmills Road - Wind Turbine?
5.4 km south of Whittlesey, Cambridgeshire, United Kingdom (postcode PE26 2TR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).