Onshore wind · United Kingdom

Glass Moor

Operator Fenland Windfarms Ltd

Operational16 MWData checked 16 November 2026Source record dated 6 May 2009

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Glass Moor is a 16 MW wind farm 4.6 km south of Whittlesey, Cambridgeshire, United Kingdom. Its planning application (S/YR02/1327) went to Fenland on 25 November 2002 and was granted on 30 May 2003. It has been operating since 1 December 2005. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 34 other energy sites within 10 km, 15 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

377 energy sites within 40 km for Glass Moor

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
16 MW (this record)
All phases
28 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Fenland Windfarms Ltd
Location
Glass MoorNear PondersbridgeCambridgeshire, Cambridgeshire, United Kingdom
Planning authority
Fenland
Planning application
S/YR02/1327
First operating
2005
Turbines
8

This record is 16 MW, one part of a site built in phases. With Glass moor Extension (12 MW) the phases on the register add up to 28 MW. Glass moor Extension

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/YR02/1327, with what the planning evidence pack adds for this site.

Every application in Fenland · Alerts for applications and incidents near here

  • 25 November 2002 Planning application submitted
  • 30 May 2003 Planning permission granted
  • 1 December 2005 Operational

None found. The register holds no published incident that names Glass Moor. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Glass Moor had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Glass Moor; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Glass Moor?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 6 May 2009.
Where is Glass Moor?
4.6 km south of Whittlesey, Cambridgeshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).