Solar · United Kingdom

Black Bush Farm

Operator Lark Energy · Owner Kingfisher Ventures Limited

Operational2.7 MWData checked 16 November 2026Source record dated 28 November 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Black Bush Farm is a 2.7 MW solar farm on the edge of Whittlesey, Cambridgeshire, United Kingdom. Its planning application (F/YR11/0256/F) went to Fenland on 4 March 2011 and was granted on 16 March 2012. It has been operating since 1 July 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 37 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 32 other sites and 357 energy sites within 40 km for Black Bush Farm

Members see the sites and incidents around this one, and every record behind them.

LARK ENERGY LIMITED (10760734), dissolved, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
2.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lark Energy
Owner
Kingfisher Ventures Limited
Location
Reach Drove, at Black Bush Farm, Whittlesey, Cambridgeshire, Cambridgeshire, United Kingdom
Planning authority
Fenland
Planning application
F/YR11/0256/F
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for F/YR11/0256/F, with what the planning evidence pack adds for this site.

Every application in Fenland · Alerts for applications and incidents near here

  • 4 March 2011 Planning application submitted
  • 16 March 2012 Planning permission granted
  • 1 May 2014 Construction started
  • 1 July 2014 Operational

None found. The register holds no published incident that names Black Bush Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Black Bush Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Black Bush Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Black Bush Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 November 2014.
Where is Black Bush Farm?
On the edge of Whittlesey, Cambridgeshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).