Onshore wind · United Kingdom
Glass moor Extension
Operator EDF/China General Nuclear Power Corporation
Operational12 MWData checked 16 November 2026Source record dated 18 December 2014
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Glass moor Extension is a 12 MW wind farm 4.6 km south of Whittlesey, Cambridgeshire, United Kingdom. Its planning application (F/YR11/0094/F) went to Fenland on 31 January 2011 and was granted on 10 April 2012. It has been operating since 31 March 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 34 other energy sites within 10 km, 15 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Glass moor Extension changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 12 MW (this record)
- All phases
- 28 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- EDF/China General Nuclear Power Corporation
- Location
- S/E Of Yewtree Farm, Glassmoor Bank, Whittlesey, Cambridge, Cambridgeshire, Cambridgeshire, CB23, United Kingdom
- Planning authority
- Fenland
- Planning application
- F/YR11/0094/F
- First operating
- 2013
- Turbines
- 6
This record is 12 MW, one part of a site built in phases. With Glass Moor (16 MW) the phases on the register add up to 28 MW. Glass Moor
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for F/YR11/0094/F, with what the planning evidence pack adds for this site.
Every application in Fenland · Alerts for applications and incidents near here
Timeline
- 31 January 2011 Planning application submitted
- 10 April 2012 Planning permission granted
- 1 September 2012 Construction started
- 31 March 2013 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Glass moor Extension. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Glass moor Extension had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Glass moor Extension; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Glass moor Extension?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 December 2014.
- Where is Glass moor Extension?
- 4.6 km south of Whittlesey, Cambridgeshire, United Kingdom (postcode CB23).