Onshore wind · United Kingdom
Green Rigg
Operator EDF/China General Nuclear Power Corporation
Operational36 MWData checked 16 November 2026Source record dated 18 December 2014
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Green Rigg is a 36 MW wind farm 18 km north of Hexham, Northumberland, United Kingdom. Its planning application (20060040) went to Northumberland on 12 January 2006 and was granted on appeal on 26 March 2010. It has been operating since 28 November 2012. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 8 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Green Rigg changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 36 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- EDF/China General Nuclear Power Corporation
- Location
- Near the A68 and Sweethope Lough, Northumberland, United Kingdom
- Planning authority
- Northumberland
- Planning application
- 20060040
- First operating
- 2012
- Turbines
- 18
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 20060040, with what the planning evidence pack adds for this site.
Every application in Northumberland · Alerts for applications and incidents near here
Timeline
- 12 January 2006 Planning application submitted
- 15 January 2008 Planning permission refused
- 26 March 2010 Planning permission granted
- 26 March 2010 Appeal granted
- 1 December 2011 Construction started
- 28 November 2012 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Green Rigg. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Green Rigg had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Green Rigg; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Green Rigg?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 December 2014.
- Where is Green Rigg?
- 18 km north of Hexham, Northumberland, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).