Solar · United Kingdom

Lockington Solar Park

Operator Lark Energy · Owner Kingfisher Ventures Limited

Planning Permission Expired15 MWData checked 16 November 2026Source record dated 17 September 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Lockington Solar Park is a 15 MW solar farm 3.8 km south-west of Long Eaton, Leicestershire, United Kingdom. Its planning application (14/00488/FULM) went to North West Leicestershire on 17 June 2014 and was granted on 14 January 2015. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 49 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 32 other sites and 616 energy sites within 40 km for Lockington Solar Park

Members see the sites and incidents around this one, and every record behind them.

LARK ENERGY LIMITED (10760734), dissolved, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
15 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Lark Energy
Owner
Kingfisher Ventures Limited
Location
Land At M1 Junction 24, Lockington And Hemington, Leicestershire, Leicestershire, United Kingdom
Planning authority
North West Leicestershire
Planning application
14/00488/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/00488/FULM, with what the planning evidence pack adds for this site.

Every application in North West Leicestershire · Alerts for applications and incidents near here

  • 17 June 2014 Planning application submitted
  • 14 January 2015 Planning permission granted
  • 14 January 2018 Planning permission expired

None found. The register holds no published incident that names Lockington Solar Park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Lockington Solar Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lockington Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Lockington Solar Park?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 17 September 2018.
Where is Lockington Solar Park?
3.8 km south-west of Long Eaton, Leicestershire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).