Planning pack for this site, £295Other options

Battery storage · United Kingdom

Ratcliffe0082

Operator FPC ELECTRIC LAND LIMITED

Awaiting Construction120 MWData checked 5 November 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Ratcliffe0082 is a 120 MW battery storage site 5.1 km south of Long Eaton, United Kingdom. Its status in the public dataset is awaiting construction. There are 53 other energy sites within 10 km, 18 of them battery storage sites. The register holds no incident at this site. It holds 14 incidents at battery storage sites in the United Kingdom, and 196 worldwide.

FPC ELECTRIC LAND LIMITED (09542958), active, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ratcliffe0082 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 31 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells31 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool125 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire134 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Battery)
Capacity
120 MW
Capacity figure from
Capacity Market register (EMR Delivery Body)
Status
Awaiting Construction (Capacity Market unit, delivery year 2027)
Operator
FPC ELECTRIC LAND LIMITED
Location
NG11 0EA, United Kingdom

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Ratcliffe0082. If you know of one, report it (confidential reports are anonymised).

Has Ratcliffe0082 had a fire or other incident?
None is on the register as of 11 November 2026. The register holds no published incident that names Ratcliffe0082; it holds 14 incidents at battery storage sites in the United Kingdom.
What is the status of Ratcliffe0082?
Awaiting Construction, in the public dataset.
Where is Ratcliffe0082?
5.1 km south of Long Eaton, United Kingdom (postcode NG11 0EA).

The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).