Stoke Lane - Battery Energy Storage
Operator FPC Electric Land Limited · Owner Eli Midco Limited
Awaiting Construction130 MWData checked 16 November 2026Source record dated 15 July 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Stoke Lane - Battery Energy Storage is a 130 MW battery storage site 4.8 km west of Poringland, Norfolk, United Kingdom. Its planning application (2021/2645) went to South Norfolk on 2 December 2021 and was granted on 9 September 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 43 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Stoke Lane - Battery Energy Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
FPC ELECTRIC LAND LIMITED (09542958), active, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Stoke Lane - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 134 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 134 km | Significant |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 172 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 238 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 130 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- FPC Electric Land Limited
- Owner
- Eli Midco Limited
- Location
- N/O Stoke Lane Dunston, Norfolk, NR14 8QD, United Kingdom
- Planning authority
- South Norfolk
- Planning application
- 2021/2645
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2021/2645, with what the planning evidence pack adds for this site.
Every application in South Norfolk · Alerts for applications and incidents near here
Timeline
- 2 December 2021 Planning application submitted
- 9 September 2022 Planning permission granted
- 9 September 2025 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Stoke Lane - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Stoke Lane - Battery Energy Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Stoke Lane - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Stoke Lane - Battery Energy Storage?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 July 2025.
- Where is Stoke Lane - Battery Energy Storage?
- 4.8 km west of Poringland, Norfolk, United Kingdom (postcode NR14 8QD).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).