← Back to Norfolk
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Hickling Lane, Swainsthorpe -Battery Storage

Operator EDF Energy Renewables · Owner Pivoted Power LLP

Awaiting Construction114 MWData checked 16 November 2026Source record dated 18 September 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Hickling Lane, Swainsthorpe -Battery Storage is a 114 MW battery storage site 5 km west of Poringland, Norfolk, United Kingdom. Its planning application (2023/0617) went to South Norfolk on 9 March 2023 and was granted on 13 September 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 42 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

EDF ENERGY RENEWABLES LIMITED (06456689), active, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hickling Lane, Swainsthorpe -Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 135 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction135 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells172 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire239 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
114 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
EDF Energy Renewables
Owner
Pivoted Power LLP
Location
Land North Of Hickling Lane Swainsthorpe, Norfolk, NR14 8PW, United Kingdom
Planning authority
South Norfolk
Planning application
2023/0617

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2023/0617, with what the planning evidence pack adds for this site.

Every application in South Norfolk · Alerts for applications and incidents near here

  • 9 March 2023 Planning application submitted
  • 13 September 2023 Planning permission granted
  • 13 September 2026 Planning permission expired

None found. The register holds no published incident that names Hickling Lane, Swainsthorpe -Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Hickling Lane, Swainsthorpe -Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hickling Lane, Swainsthorpe -Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Hickling Lane, Swainsthorpe -Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 18 September 2023.
Where is Hickling Lane, Swainsthorpe -Battery Storage?
5 km west of Poringland, Norfolk, United Kingdom (postcode NR14 8PW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).