Onshore wind · United Kingdom
Tick Fen Farm, Puddock Road - Wind Turbine
Operator Whittome Farms
Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 9 July 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Tick Fen Farm, Puddock Road - Wind Turbine is a 0.5 MW wind farm 4.2 km east of Ramsey, Cambridgeshire, United Kingdom. Its planning application (24/00311/FUL) went to Huntingdonshire on 11 March 2024 and was granted on 17 May 2024. Construction started on 1 December 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 23 other energy sites within 10 km, 9 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Tick Fen Farm, Puddock Road - Wind Turbine changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tick Fen Farm, Puddock Road - Wind Turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1275, Fire damages Siemens Gamesa turbine at French Farm wind farm, 7.2 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1275 | 2022 | Fire damages Siemens Gamesa turbine at French Farm wind farm | 7.2 km | Significant |
| EIR-2624 | 2018 | Lightning strike reportedly sets Cambridgeshire wind turbine alight | 7.2 km | Significant |
| EIR-1578 | 2024 | Wind turbine fire near Chumleigh in Devon | 8.0 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 0.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Whittome Farms
- Location
- Field South Of Tick Fen Farm Puddock Road Warboys, Cambridgeshire, PE28 2UB, United Kingdom
- Planning authority
- Huntingdonshire
- Planning application
- 24/00311/FUL
- Turbines
- 1, 100 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 24/00311/FUL, with what the planning evidence pack adds for this site.
Every application in Huntingdonshire · Alerts for applications and incidents near here
Timeline
- 11 March 2024 Planning application submitted
- 17 May 2024 Planning permission granted
- 1 December 2024 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Tick Fen Farm, Puddock Road - Wind Turbine. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Tick Fen Farm, Puddock Road - Wind Turbine had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Tick Fen Farm, Puddock Road - Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Tick Fen Farm, Puddock Road - Wind Turbine?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 9 July 2024.
- Where is Tick Fen Farm, Puddock Road - Wind Turbine?
- 4.2 km east of Ramsey, Cambridgeshire, United Kingdom (postcode PE28 2UB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).