Onshore wind · United Kingdom

Red Tile

Operator Wind Prospect Developments · Owner Wind Prospect Group Limited

Operational24 MWData checked 16 November 2026Source record dated 4 December 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Red Tile is a 24 MW wind farm 5.9 km east of Ramsey, Cambridgeshire, United Kingdom. Its planning application (0302827FUL) went to Huntingdonshire on 15 October 2003 and was granted on 7 February 2005. It has been operating since 1 December 2006. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 20 other energy sites within 10 km, 5 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 11 other sites and 365 energy sites within 40 km for Red Tile

Members see the sites and incidents around this one, and every record behind them.

WIND PROSPECT DEVELOPMENTS LIMITED (04113951), dissolved, since 2000. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
24 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Wind Prospect Developments
Owner
Wind Prospect Group Limited
Location
Land Adjacent to Broadpool FarmHigh Fen Straight DroveWarboysHuntingdon, Cambridgeshire, United Kingdom
Planning authority
Huntingdonshire
Planning application
0302827FUL
First operating
2006
Turbines
12

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 0302827FUL, with what the planning evidence pack adds for this site.

Every application in Huntingdonshire · Alerts for applications and incidents near here

  • 15 October 2003 Planning application submitted
  • 7 February 2005 Planning permission granted
  • 1 May 2006 Construction started
  • 1 December 2006 Operational

None found. The register holds no published incident that names Red Tile. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Red Tile had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Red Tile; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Red Tile?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 December 2017.
Where is Red Tile?
5.9 km east of Ramsey, Cambridgeshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).