Onshore wind · United Kingdom

Deeping St Nicholas Wind Farm

Operator Wind Prospect Developments · Owner Wind Prospect Group Limited

Operational16.4 MWData checked 16 November 2026Source record dated 4 December 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Deeping St Nicholas Wind Farm is a 16.4 MW wind farm 7.9 km south-west of Spalding, Lincolnshire, United Kingdom. Its planning application (H03-0161-02) went to South Holland on 11 February 2002 and was granted on appeal on 18 May 2003. It has been operating since 1 August 2006. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 22 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 11 other sites and 335 energy sites within 40 km for Deeping St Nicholas Wind Farm

Members see the sites and incidents around this one, and every record behind them.

WIND PROSPECT DEVELOPMENTS LIMITED (04113951), dissolved, since 2000. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
16.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Wind Prospect Developments
Owner
Wind Prospect Group Limited
Location
Vine House Farm Worths Farm and Porters Farm, Deeping St Nicholas, Lincolnshire, United Kingdom
Planning authority
South Holland
Planning application
H03-0161-02
Appeal reference
APP/A2525/A/02/1099738
First operating
2006
Turbines
8

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for H03-0161-02, with what the planning evidence pack adds for this site.

Every application in South Holland · Alerts for applications and incidents near here

  • 11 February 2002 Planning application submitted
  • 13 September 2002 Planning permission refused
  • 18 May 2003 Planning permission granted
  • 18 May 2003 Appeal granted
  • 1 August 2006 Operational

None found. The register holds no published incident that names Deeping St Nicholas Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Deeping St Nicholas Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Deeping St Nicholas Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Deeping St Nicholas Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 December 2017.
Where is Deeping St Nicholas Wind Farm?
7.9 km south-west of Spalding, Lincolnshire, United Kingdom.