Planning application · Onshore wind · Huntingdonshire

Red Tile

Operational24 MWApplication 0302827FULSubmitted 15 October 2003Granted 7 February 2005

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
0302827FUL
Planning authority
Huntingdonshire
County or area
Cambridgeshire
Nation
England
Technology
Onshore wind
Capacity
24 MW
Status
Operational
Operator or applicant
Wind Prospect Developments
Location
Land Adjacent to Broadpool Farm High Fen Straight Drove Warboys Huntingdon
Turbines
12
First operating
2006
  • 15 October 2003 Planning application submitted
  • 7 February 2005 Planning permission granted
  • 1 May 2006 Construction started
  • 1 December 2006 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1275, Fire damages Siemens Gamesa turbine at French Farm wind farm, 6.5 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12752022Fire damages Siemens Gamesa turbine at French Farm wind farm6.5 kmSignificant
EIR-15782024Wind turbine fire near Chumleigh in Devon7.6 kmSignificant
EIR-08952018Wind turbine catches fire at Doddington wind farm after storms9.6 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Red Tile is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Huntingdonshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.