Solar · United Kingdom

Perth Wastewater Treatment Works

Operator Scottish Water

Operational0.4 MWData checked 16 November 2026Source record dated 4 April 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Perth Wastewater Treatment Works is a 0.4 MW solar farm 3.1 km south-east of Perth, United Kingdom. Its planning application (19/00037/FLL) went to Perth and Kinross on 1 February 2019 and was granted on 7 June 2019. It has been operating since 1 July 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 35 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 39 other sites and 297 energy sites within 40 km for Perth Wastewater Treatment Works

Members see the sites and incidents around this one, and every record behind them.

SCOTTISH WATER LIMITED (SC207004), active, since 2000. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
0.4 MW (this record)
All phases
0.7 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Scottish Water
Location
Sleepless Inch Waste Water Tre, Rhynd, Perth, Tayside, Perth and Kinross, PH2 8QJ, United Kingdom
Planning authority
Perth and Kinross
Planning application
19/00037/FLL
First operating
2021

This record is 0.4 MW, one part of a site built in phases. With Perth Wastewater Treatment Works (Extension) (0.3 MW) the phases on the register add up to 0.7 MW. Perth Wastewater Treatment Works (Extension)

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 19/00037/FLL, with what the planning evidence pack adds for this site.

Every application in Perth and Kinross · Alerts for applications and incidents near here

  • 1 February 2019 Planning application submitted
  • 7 June 2019 Planning permission granted
  • 21 December 2020 Construction started
  • 1 July 2021 Operational

None found. The register holds no published incident that names Perth Wastewater Treatment Works. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Perth Wastewater Treatment Works had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Perth Wastewater Treatment Works; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Perth Wastewater Treatment Works?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 April 2023.
Where is Perth Wastewater Treatment Works?
3.1 km south-east of Perth, United Kingdom (postcode PH2 8QJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).