Battery storage · United Kingdom

Perth Wastewater Treatment Works (Extension)

Operator Scottish Water

OperationalData checked 16 November 2026Source record dated 1 January 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Perth Wastewater Treatment Works (Extension) is a battery storage site on the edge of Perth, United Kingdom. Its planning application (20/00540/FLL) went to Perth and Kinross on 18 May 2020 and was granted on 8 September 2020. It has been operating since 1 January 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 35 other energy sites within 10 km, 15 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 39 other sites and 297 energy sites within 40 km for Perth Wastewater Treatment Works (Extension)

Members see the sites and incidents around this one, and every record behind them.

SCOTTISH WATER LIMITED (SC207004), active, since 2000. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Co-located with RE)
Status
Operational
Operator or applicant
Scottish Water
Location
Land 150 Metres South West Of, Rhynd, Perth, Tayside, Perth and Kinross, PH1 0AD, United Kingdom
Planning authority
Perth and Kinross
Planning application
20/00540/FLL
First operating
2022

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/00540/FLL, with what the planning evidence pack adds for this site.

Every application in Perth and Kinross · Alerts for applications and incidents near here

  • 18 May 2020 Planning application submitted
  • 8 September 2020 Planning permission granted
  • 1 January 2022 Operational

None found. The register holds no published incident that names Perth Wastewater Treatment Works (Extension). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Perth Wastewater Treatment Works (Extension) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Perth Wastewater Treatment Works (Extension); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Perth Wastewater Treatment Works (Extension)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 January 2022.
Where is Perth Wastewater Treatment Works (Extension)?
On the edge of Perth, United Kingdom (postcode PH1 0AD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).