Solar · United Kingdom

Aviva Headquarters

Operator Aviva

Operational1.8 MWData checked 16 November 2026Source record dated 1 November 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Aviva Headquarters is a 1.8 MW solar farm on the edge of Perth, United Kingdom. Its planning application (19/00847/FLL) went to Perth and Kinross on 7 June 2019 and was granted on 19 July 2019. It has been operating since 1 November 2020. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 23 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 3 other sites and 299 energy sites within 40 km for Aviva Headquarters

Members see the sites and incidents around this one, and every record behind them.

AVIVA PLC (02468686), active, since 1990. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
1.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Aviva
Location
Aviva Headquarters Pitheavlis, Perth, Tayside, Perth and Kinross, PH2 0NH, United Kingdom
Planning authority
Perth and Kinross
Planning application
19/00847/FLL
First operating
2020

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 19/00847/FLL, with what the planning evidence pack adds for this site.

Every application in Perth and Kinross · Alerts for applications and incidents near here

  • 7 June 2019 Planning application submitted
  • 19 July 2019 Planning permission granted
  • 1 November 2020 Operational

None found. The register holds no published incident that names Aviva Headquarters. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Aviva Headquarters had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Aviva Headquarters; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Aviva Headquarters?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 November 2020.
Where is Aviva Headquarters?
On the edge of Perth, United Kingdom (postcode PH2 0NH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).