Onshore wind · United Kingdom
Woolley Hill Wind Farm
Operator Aviva
Operational10 MWData checked 16 November 2026Source record dated 30 November 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Woolley Hill Wind Farm is a 10 MW wind farm 8.3 km west of Huntingdon, Cambridgeshire, United Kingdom. Its planning application (1001741FUL) went to Huntingdonshire on 11 November 2010 and was granted on appeal on 23 March 2012. It has been operating since 30 April 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 17 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Woolley Hill Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
AVIVA PLC (02468686), active, since 1990. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 10 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Aviva
- Location
- North of the A14, between the villages of Ellington & Woolley, Cambridgeshire, United Kingdom
- Planning authority
- Huntingdonshire
- Planning application
- 1001741FUL
- Appeal reference
- 1100021REFUSL
- First operating
- 2014
- Turbines
- 4
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 1001741FUL, with what the planning evidence pack adds for this site.
Every application in Huntingdonshire · Alerts for applications and incidents near here
Timeline
- 11 November 2010 Planning application submitted
- 19 July 2011 Planning permission refused
- 23 March 2012 Planning permission granted
- 23 March 2012 Appeal granted
- 17 March 2014 Construction started
- 30 April 2014 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Woolley Hill Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Woolley Hill Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Woolley Hill Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Woolley Hill Wind Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 30 November 2016.
- Where is Woolley Hill Wind Farm?
- 8.3 km west of Huntingdon, Cambridgeshire, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).