Solar · United Kingdom
Perth Wastewater Treatment Works (Extension)
Operator Scottish Water
Operational0.3 MWData checked 16 November 2026Source record dated 17 May 2021
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Perth Wastewater Treatment Works (Extension) is a 0.3 MW solar farm on the edge of Perth, United Kingdom. Its planning application (20/00540/FLL) went to Perth and Kinross on 18 May 2020 and was granted on 8 September 2020. It has been operating since 17 May 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 35 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Perth Wastewater Treatment Works (Extension) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
SCOTTISH WATER LIMITED (SC207004), active, since 2000. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Solar
- Capacity
- 0.3 MW (this record)
- All phases
- 0.7 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Scottish Water
- Location
- Land 150 Metres South West Of, Rhynd, Perth, Tayside, Perth and Kinross, PH1 0AD, United Kingdom
- Planning authority
- Perth and Kinross
- Planning application
- 20/00540/FLL
- First operating
- 2021
This record is 0.3 MW, one part of a site built in phases. With Perth Wastewater Treatment Works (0.4 MW) the phases on the register add up to 0.7 MW. Perth Wastewater Treatment Works
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 20/00540/FLL, with what the planning evidence pack adds for this site.
Every application in Perth and Kinross · Alerts for applications and incidents near here
Timeline
- 18 May 2020 Planning application submitted
- 8 September 2020 Planning permission granted
- 17 May 2021 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Perth Wastewater Treatment Works (Extension). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Perth Wastewater Treatment Works (Extension) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Perth Wastewater Treatment Works (Extension); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Perth Wastewater Treatment Works (Extension)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 17 May 2021.
- Where is Perth Wastewater Treatment Works (Extension)?
- On the edge of Perth, United Kingdom (postcode PH1 0AD).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).