← Back to East Sussex

Solar · United Kingdom

Natewood Farm

Operator Haymaker Energy

Operational8.9 MWData checked 16 November 2026Source record dated 27 January 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Natewood Farm is a 8.9 MW solar farm on the edge of Hailsham, East Sussex, United Kingdom. Its planning application (WD/2014/0153/MAJ) went to Wealden on 6 February 2014 and was granted on 17 April 2014. It has been operating since 27 January 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 36 other energy sites within 10 km, 30 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 7 other sites and 190 energy sites within 40 km for Natewood Farm

Members see the sites and incidents around this one, and every record behind them.

HAYMAKER ENERGY LIMITED (08400512), active, since 2013. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
8.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Haymaker Energy
Location
Natewood Farm, Polegate Road, Hailsham, East Sussex, East Sussex, BN27 3PH, United Kingdom
Planning authority
Wealden
Planning application
WD/2014/0153/MAJ
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for WD/2014/0153/MAJ, with what the planning evidence pack adds for this site.

Every application in Wealden · Alerts for applications and incidents near here

  • 6 February 2014 Planning application submitted
  • 17 April 2014 Planning permission granted
  • 27 October 2014 Construction started
  • 27 January 2015 Operational

None found. The register holds no published incident that names Natewood Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Natewood Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Natewood Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Natewood Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 January 2015.
Where is Natewood Farm?
On the edge of Hailsham, East Sussex, United Kingdom (postcode BN27 3PH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).