Wilbees Farm

Operator Hive Energy

Operational5 MWData checked 16 November 2026Source record dated 17 November 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wilbees Farm is a 5 MW solar farm 5.3 km south-west of Hailsham, East Sussex, United Kingdom. Its planning application (WD/2014/1838/MEA) went to Wealden on 5 September 2014 and was granted on 14 November 2014. It has been operating since 21 October 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 33 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 27 other sites and 189 energy sites within 40 km for Wilbees Farm

Members see the sites and incidents around this one, and every record behind them.

HIVE ENERGY ASIA LIMITED (11668649), active, since 2018. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Hive Energy
Location
Wilbees Farm, The Street, Polegate, East Sussex, United Kingdom
Planning authority
Wealden
Planning application
WD/2014/1838/MEA
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for WD/2014/1838/MEA, with what the planning evidence pack adds for this site.

Every application in Wealden · Alerts for applications and incidents near here

  • 5 September 2014 Planning application submitted
  • 14 November 2014 Planning permission granted
  • 1 July 2016 Construction started
  • 21 October 2016 Operational

None found. The register holds no published incident that names Wilbees Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Wilbees Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wilbees Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wilbees Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 17 November 2016.
Where is Wilbees Farm?
5.3 km south-west of Hailsham, East Sussex, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).