Berwick solar farm

Operator Susenco/Low Carbon

Operational8.2 MWData checked 16 November 2026Source record dated 1 April 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Berwick solar farm is a 8.2 MW solar farm 5.9 km west of Hailsham, East Sussex, United Kingdom. Its planning application (WD/2013/1664/MEA) went to Wealden on 12 August 2013 and was granted on 21 October 2013. It has been operating since 31 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 27 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

217 energy sites within 40 km for Berwick solar farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
8.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Susenco/Low Carbon
Location
Berwick, Polegate, West Sussex, East Sussex, United Kingdom
Planning authority
Wealden
Planning application
WD/2013/1664/MEA
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for WD/2013/1664/MEA, with what the planning evidence pack adds for this site.

Every application in Wealden · Alerts for applications and incidents near here

  • 12 August 2013 Planning application submitted
  • 21 October 2013 Planning permission granted
  • 20 October 2014 Construction started
  • 31 March 2015 Operational

None found. The register holds no published incident that names Berwick solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Berwick solar farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Berwick solar farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Berwick solar farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 April 2015.
Where is Berwick solar farm?
5.9 km west of Hailsham, East Sussex, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).