Solar · United Kingdom
Tesco Stores, North Street - Solar Panels
Operator Tesco Stores Limited · Owner Tesco Holdings Limited
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 20 July 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Tesco Stores, North Street - Solar Panels is a 0.2 MW solar farm in Hailsham, East Sussex, United Kingdom. Its planning application (WD/2026/0992/P12) went to Wealden on 15 May 2026 and was granted on 6 July 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 36 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Tesco Stores, North Street - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
TESCO STORES LIMITED (00519500), active, since 1953. 60 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tesco Stores, North Street - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1303, Solar panel inverter fault destroys two Lewes homes, 18 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1303 | 2017 | Solar panel inverter fault destroys two Lewes homes | 18 km | Significant |
| EIR-1527 | 2023 | Fire affects solar panels on nursing home roof in Woodingdean | 24 km | Minor |
| EIR-1522 | 2026 | Fire damages roof with one solar panel in The Charltons | 26 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Tesco Stores Limited
- Owner
- Tesco Holdings Limited
- Location
- Tesco Stores, North Street, East Sussex, BN27 1DN, United Kingdom
- Planning authority
- Wealden
- Planning application
- WD/2026/0992/P12
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for WD/2026/0992/P12, with what the planning evidence pack adds for this site.
Every application in Wealden · Alerts for applications and incidents near here
Status changed from Application Submitted to Awaiting Construction on 16 November 2026.
Timeline
- 15 May 2026 Planning application submitted
- 6 July 2026 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Tesco Stores, North Street - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Tesco Stores, North Street - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Tesco Stores, North Street - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Tesco Stores, North Street - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
- Where is Tesco Stores, North Street - Solar Panels?
- In Hailsham, East Sussex, United Kingdom (postcode BN27 1DN).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).