← Back to Gwynedd

Solar · United Kingdom

Kinmel 1 CIC

Operator Haymaker Energy

Operational5 MWData checked 16 November 2026Source record dated 25 July 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kinmel 1 CIC is a 5 MW solar farm 3.8 km east of Abergele, Gwynedd, United Kingdom. Its planning application (0/40999) went to Conwy on 27 August 2014 and was granted on 11 March 2015. It has been operating since 27 June 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 8 other energy sites within 10 km, 3 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 7 other sites and 111 energy sites within 40 km for Kinmel 1 CIC

Members see the sites and incidents around this one, and every record behind them.

HAYMAKER ENERGY LIMITED (08400512), active, since 2013. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Haymaker Energy
Location
Land immediately north of A547, Rhuddlan Road, Towyn, Conwy, Gwynedd, United Kingdom
Planning authority
Conwy
Planning application
0/40999
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 0/40999, with what the planning evidence pack adds for this site.

Every application in Conwy · Alerts for applications and incidents near here

  • 27 August 2014 Planning application submitted
  • 11 March 2015 Planning permission granted
  • 21 March 2016 Construction started
  • 27 June 2016 Operational

None found. The register holds no published incident that names Kinmel 1 CIC. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Kinmel 1 CIC had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kinmel 1 CIC; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Kinmel 1 CIC?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 25 July 2016.
Where is Kinmel 1 CIC?
3.8 km east of Abergele, Gwynedd, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).