Gib Lane Solar farm (Extension)

Operator Haymaker Energy

Operational5 MWData checked 16 November 2026Source record dated 15 June 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Gib Lane Solar farm (Extension) is a 5 MW solar farm 5.5 km east of Aylesbury, Buckinghamshire, United Kingdom. Its planning application (15/02533/APP) went to Buckinghamshire on 22 July 2015 and was granted on 21 October 2015. It has been operating since 22 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 23 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 7 other sites and 664 energy sites within 40 km for Gib Lane Solar farm (Extension)

Members see the sites and incidents around this one, and every record behind them.

HAYMAKER ENERGY LIMITED (08400512), active, since 2013. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW (this record)
All phases
29.2 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Haymaker Energy
Location
Land to East of Gib Lane, Bierton, Buckinghamshire, United Kingdom
Planning authority
Buckinghamshire
Planning application
15/02533/APP
First operating
2016

This record is 5 MW, one part of a site built in phases. With Gib Lane (Aston Clinton solar park) (24.2 MW) the phases on the register add up to 29.2 MW. Gib Lane (Aston Clinton solar park)

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/02533/APP, with what the planning evidence pack adds for this site.

Every application in Buckinghamshire · Alerts for applications and incidents near here

  • 22 July 2015 Planning application submitted
  • 21 October 2015 Planning permission granted
  • 8 January 2016 Construction started
  • 22 March 2016 Operational

None found. The register holds no published incident that names Gib Lane Solar farm (Extension). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Gib Lane Solar farm (Extension) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Gib Lane Solar farm (Extension); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Gib Lane Solar farm (Extension)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 June 2016.
Where is Gib Lane Solar farm (Extension)?
5.5 km east of Aylesbury, Buckinghamshire, United Kingdom.