Solar · United Kingdom
Straws Hadley Solar Farm
Operator Qair UK
Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 20 February 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Straws Hadley Solar Farm is a 49.9 MW solar farm 7.1 km north-east of Aylesbury, Buckinghamshire, United Kingdom. Its planning application (23/01094/APP) went to Buckinghamshire on 11 April 2023 and was granted on 6 December 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 34 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Straws Hadley Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
QAIR UK HOLDINGS LTD (14978538), active, since 2023. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Straws Hadley Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1519, Solar panels involved in outbuilding roof fire in Bourne End, 30 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1519 | 2025 | Solar panels involved in outbuilding roof fire in Bourne End | 30 km | Minor |
| EIR-1493 | 2026 | Solar panels catch fire on Bedford warehouse roof | 39 km | Minor |
| EIR-2939 | 2026 | Rooftop solar fire forces West Drayton school to close early | 43 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Qair UK
- Location
- West Of Tring Road Wingrave, Buckinghamshire, HP22 4LN, United Kingdom
- Planning authority
- Buckinghamshire
- Planning application
- 23/01094/APP
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/01094/APP, with what the planning evidence pack adds for this site.
Every application in Buckinghamshire · Alerts for applications and incidents near here
Timeline
- 11 April 2023 Planning application submitted
- 6 December 2024 Planning permission granted
- 6 December 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Straws Hadley Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Straws Hadley Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Straws Hadley Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Straws Hadley Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 20 February 2026.
- Where is Straws Hadley Solar Farm?
- 7.1 km north-east of Aylesbury, Buckinghamshire, United Kingdom (postcode HP22 4LN).