Moorhouse Farm

Operator Solar Park Developments

Operational5 MWData checked 16 November 2026Source record dated 27 February 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Moorhouse Farm is a 5 MW solar farm 3.3 km south of Workington, Cumbria, United Kingdom. Its planning application (2/2014/0899) went to Cumberland on 17 December 2014 and was granted on appeal on 21 March 2016. It has been operating since 30 November 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 31 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 3 other sites and 86 energy sites within 40 km for Moorhouse Farm

Members see the sites and incidents around this one, and every record behind them.

SOLAR PARK DEVELOPMENTS LTD (08203728), dissolved, since 2012. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Solar Park Developments
Location
Moor House Farm, Winscales, Workington, Cumbria, CA14 4JZ, United Kingdom
Planning authority
Cumberland
Planning application
2/2014/0899
Appeal reference
APP/G0908/W/15/3130516
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2/2014/0899, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 17 December 2014 Planning application submitted
  • 6 May 2015 Planning permission refused
  • 5 August 2015 Appeal lodged
  • 21 March 2016 Planning permission granted
  • 21 March 2016 Appeal granted
  • 30 August 2016 Construction started
  • 30 November 2016 Operational

None found. The register holds no published incident that names Moorhouse Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Moorhouse Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Moorhouse Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Moorhouse Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 February 2017.
Where is Moorhouse Farm?
3.3 km south of Workington, Cumbria, United Kingdom (postcode CA14 4JZ).