← Back to Cumbria
Planning pack for this site, £295Other options

Solar · United Kingdom

Distington Materials Recycling Facility, Pittwood Road - Solar PV Panels

Operator Cumbria Waste Management Limited · Owner Project Chicago Bidco Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 2 December 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Distington Materials Recycling Facility, Pittwood Road - Solar PV Panels is a solar farm 4.2 km south of Workington, Cumbria, United Kingdom. Its planning application (2594738) went to Cumberland on 8 October 2024 and was granted on 18 November 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 31 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

CUMBRIA WASTE MANAGEMENT LTD. (02665973), active, since 1991. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Distington Materials Recycling Facility, Pittwood Road - Solar PV Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2016, Solar panel fire evacuates Hawick High School, 102 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20162022Solar panel fire evacuates Hawick High School102 kmSignificant
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre126 kmMinor
EIR-14992025Solar panels linked to fires at council buildings in Northumberland134 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Cumbria Waste Management Limited
Owner
Project Chicago Bidco Limited
Location
Distington Materials Recycling Facility Distington Waste Management Park Pittwood Road Workington, Cumbria, CA14 4JP, United Kingdom
Planning authority
Cumberland
Planning application
2594738

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2594738, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 8 October 2024 Planning application submitted
  • 18 November 2024 Planning permission granted

None found. The register holds no published incident that names Distington Materials Recycling Facility, Pittwood Road - Solar PV Panels. If you know of one, report it (confidential reports are anonymised).

Has Distington Materials Recycling Facility, Pittwood Road - Solar PV Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Distington Materials Recycling Facility, Pittwood Road - Solar PV Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Distington Materials Recycling Facility, Pittwood Road - Solar PV Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2024.
Where is Distington Materials Recycling Facility, Pittwood Road - Solar PV Panels?
4.2 km south of Workington, Cumbria, United Kingdom (postcode CA14 4JP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).