Onshore wind · United Kingdom
Winscales Phase I and II
Operator Cumbria Wind Farms
Operational8.8 MWData checked 16 November 2026Source record dated 7 September 2009
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Winscales Phase I and II is a 8.8 MW wind farm on the edge of Workington, Cumbria, United Kingdom. Its planning application (2/97/0902) went to Cumberland on 18 November 1997 and was granted on 7 June 1999. It has been operating since 1 December 2004. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 37 other energy sites within 10 km, 21 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Winscales Phase I and II changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 8.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Cumbria Wind Farms
- Location
- Winscales, Workington, Cumbria, Cumbria, United Kingdom
- Planning authority
- Cumberland
- Planning application
- 2/97/0902
- First operating
- 2004
- Turbines
- 11
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2/97/0902, with what the planning evidence pack adds for this site.
Every application in Cumberland · Alerts for applications and incidents near here
Timeline
- 18 November 1997 Planning application submitted
- 7 June 1999 Planning permission granted
- 1 December 2004 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Winscales Phase I and II. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Winscales Phase I and II had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Winscales Phase I and II; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Winscales Phase I and II?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 7 September 2009.
- Where is Winscales Phase I and II?
- On the edge of Workington, Cumbria, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).