Winscales Phase I and II is a 8.8 MW wind farm on the edge of Workington, Cumbria, United Kingdom. Its planning application (2/97/0902) went to Cumberland on 18 November 1997 and was granted on 7 June 1999. It has been operating since 1 December 2004. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 37 other energy sites within 10 km, 21 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 4 other sites and 92 energy sites within 40 km for Winscales Phase I and II

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
8.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Cumbria Wind Farms
Location
Winscales, Workington, Cumbria, Cumbria, United Kingdom
Planning authority
Cumberland
Planning application
2/97/0902
First operating
2004
Turbines
11

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2/97/0902, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 18 November 1997 Planning application submitted
  • 7 June 1999 Planning permission granted
  • 1 December 2004 Operational

None found. The register holds no published incident that names Winscales Phase I and II. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Winscales Phase I and II had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Winscales Phase I and II; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Winscales Phase I and II?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 7 September 2009.
Where is Winscales Phase I and II?
On the edge of Workington, Cumbria, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).