← Back to Lincolnshire

Onshore wind · United Kingdom

Neslam Wind Farm

Operator Cumbria Wind Farms

Application Withdrawn12 MWData checked 16 November 2026Source record dated 2 November 2010

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Neslam Wind Farm is a 12 MW wind farm 14 km north-west of Spalding, Lincolnshire, United Kingdom. Its planning application (S09/0296) went to South Kesteven on 3 February 2009 and was withdrawn on 16 September 2009. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 22 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 4 other sites and 319 energy sites within 40 km for Neslam Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
12 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Cumbria Wind Farms
Location
Sempringham Fen, Sleaford, Lincolnshire, NG34 0NH, United Kingdom
Planning authority
South Kesteven
Planning application
S09/0296
Turbines
6

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S09/0296, with what the planning evidence pack adds for this site.

Every application in South Kesteven · Alerts for applications and incidents near here

  • 3 February 2009 Planning application submitted
  • 16 September 2009 Application withdrawn

None found. The register holds no published incident that names Neslam Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Neslam Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Neslam Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Neslam Wind Farm?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 2 November 2010.
Where is Neslam Wind Farm?
14 km north-west of Spalding, Lincolnshire, United Kingdom (postcode NG34 0NH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).