← Back to Lincolnshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Vicarage Drove - Battery Storage Facility

Operator Vicarage Drove Bess Limited (AGR Group) · Owner Agr Solar 2 Limited

Awaiting Construction50 MWData checked 16 November 2026Source record dated 12 May 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Vicarage Drove - Battery Storage Facility is a 50 MW battery storage site 14 km west of Boston, Lincolnshire, United Kingdom. Its planning application (B/24/0363) went to Boston on 10 September 2024 and was granted on 5 February 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 26 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

AGR SOLAR 2 LIMITED (12294992), active, since 2019. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Vicarage Drove - Battery Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 63 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells63 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction167 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire178 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
50 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Vicarage Drove Bess Limited (AGR Group)
Owner
Agr Solar 2 Limited
Location
S/O Vicarage Drove, Bicker, Boston, Lincolnshire, PE20 3BF, United Kingdom
Planning authority
Boston
Planning application
B/24/0363

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for B/24/0363, with what the planning evidence pack adds for this site.

Every application in Boston · Alerts for applications and incidents near here

  • 10 September 2024 Planning application submitted
  • 5 February 2025 Planning permission granted
  • 5 February 2027 Planning permission runs out

None found. The register holds no published incident that names Vicarage Drove - Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Vicarage Drove - Battery Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Vicarage Drove - Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Vicarage Drove - Battery Storage Facility?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2025.
Where is Vicarage Drove - Battery Storage Facility?
14 km west of Boston, Lincolnshire, United Kingdom (postcode PE20 3BF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).