← Back to Cumbria

Onshore wind · United Kingdom

Potato Pot Wind Farm

Operator Capital Dynamics

Operational6 MWData checked 16 November 2026Source record dated 4 January 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Potato Pot Wind Farm is a 6 MW wind farm 5.2 km south-east of Workington, Cumbria, United Kingdom. Its planning application (2/2012/0594) went to Cumberland on 7 August 2012 and was granted on appeal on 23 October 2013. It has been operating since 15 September 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 32 other energy sites within 10 km, 20 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 5 other sites and 82 energy sites within 40 km for Potato Pot Wind Farm

Members see the sites and incidents around this one, and every record behind them.

CAPITAL DYNAMICS LIMITED (02215798), active, since 1988. 48 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Capital Dynamics
Location
Land atPotato PotBranthwaiteWorkingtonCumbria, Cumbria, United Kingdom
Planning authority
Cumberland
Planning application
2/2012/0594
Appeal reference
APP/G0908/A/13/2189934/NWF
First operating
2016
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2/2012/0594, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 7 August 2012 Planning application submitted
  • 25 January 2013 Planning permission refused
  • 23 October 2013 Planning permission granted
  • 23 October 2013 Appeal granted
  • 15 September 2015 Construction started
  • 15 September 2016 Operational

None found. The register holds no published incident that names Potato Pot Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Potato Pot Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Potato Pot Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Potato Pot Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 January 2017.
Where is Potato Pot Wind Farm?
5.2 km south-east of Workington, Cumbria, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).