Battery storage · United Kingdom
Dean Moor Solar Farm & Battery Storage
Operator Firma Energy & IB Vogt
Awaiting ConstructionData checked 16 November 2026Source record dated 13 July 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Dean Moor Solar Farm & Battery Storage is a battery storage site 6.7 km south-east of Workington, Cumbria, United Kingdom. Its planning application (EN010155) went to The Planning Inspectorate - National Infrastructure on 26 March 2025 and was granted on 2 July 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 30 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Dean Moor Solar Farm & Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dean Moor Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 139 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 139 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 226 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 337 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Co-located with RE)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Firma Energy & IB Vogt
- Location
- 1.1km east of Lillyhall Industrial Estate, Workington, Cumbria, CA14 4RB, United Kingdom
- Planning authority
- The Planning Inspectorate - National Infrastructure
- Planning application
- EN010155
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for EN010155, with what the planning evidence pack adds for this site.
Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here
Timeline
- 26 March 2025 Planning application submitted
- 2 July 2026 Planning permission granted
- 2 July 2031 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Dean Moor Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Dean Moor Solar Farm & Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Dean Moor Solar Farm & Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Dean Moor Solar Farm & Battery Storage?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 July 2026.
- Where is Dean Moor Solar Farm & Battery Storage?
- 6.7 km south-east of Workington, Cumbria, United Kingdom (postcode CA14 4RB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).