← Back to Lancashire
Planning pack for this site, £295Other options

Solar · United Kingdom

Land off Moss Side Lane

Operator Solar Park Developments

Revised18 MWData checked 16 November 2026Source record dated 9 March 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land off Moss Side Lane is a 18 MW solar farm 4.1 km south-west of Kirkham, Lancashire, United Kingdom. Its planning application (14/0696) went to Fylde on 1 October 2014 and was refused on 4 February 2015. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 33 other energy sites within 10 km, 26 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

SOLAR PARK DEVELOPMENTS LTD (08203728), dissolved, since 2012. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Land off Moss Side Lane sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 41 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school41 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof79 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent92 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
18 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Solar Park Developments
Location
Land of Moss Side Lane, Wrea Green, Preston, Lancashire, PR4 2WP, United Kingdom
Planning authority
Fylde
Planning application
14/0696

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/0696, with what the planning evidence pack adds for this site.

Every application in Fylde · Alerts for applications and incidents near here

  • 1 October 2014 Planning application submitted
  • 4 February 2015 Planning permission refused

None found. The register holds no published incident that names Land off Moss Side Lane. If you know of one, report it (confidential reports are anonymised).

Has Land off Moss Side Lane had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land off Moss Side Lane; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land off Moss Side Lane?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 9 March 2015.
Where is Land off Moss Side Lane?
4.1 km south-west of Kirkham, Lancashire, United Kingdom (postcode PR4 2WP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).