← Back to Lancashire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Peel Road - Battery Storage

Operator Energi Generation

Awaiting Construction20 MWData checked 16 November 2026Source record dated 25 September 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Peel Road - Battery Storage is a 20 MW battery storage site 4.7 km north of Lytham St Annes, Lancashire, United Kingdom. Its planning application (23/0125) went to Fylde on 14 February 2023 and was granted on 6 September 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 29 other energy sites within 10 km, 6 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ENERGI GENERATION LTD (09589366), active, since 2015. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Peel Road - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 44 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool44 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells144 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire241 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Energi Generation
Location
Peel Road, Opp Sub Station, Westby With Plumptons, Blackpool, Lancashire, FY4 5JU, United Kingdom
Planning authority
Fylde
Planning application
23/0125

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/0125, with what the planning evidence pack adds for this site.

Every application in Fylde · Alerts for applications and incidents near here

  • 14 February 2023 Planning application submitted
  • 6 September 2023 Planning permission granted
  • 22 September 2026 Planning permission expired

None found. The register holds no published incident that names Peel Road - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Peel Road - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Peel Road - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Peel Road - Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 September 2023.
Where is Peel Road - Battery Storage?
4.7 km north of Lytham St Annes, Lancashire, United Kingdom (postcode FY4 5JU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).