Solar · United Kingdom

Blackpool Police Divisional Headquarters - Solar Panels

Operator Equans Regeneration Limited

Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 13 July 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Blackpool Police Divisional Headquarters - Solar Panels is a 0.4 MW solar farm 4.2 km south of Poulton-le-Fylde, Lancashire, United Kingdom. Its planning application (23/0271) went to Blackpool on 17 April 2023 and was granted on 5 June 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 32 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Blackpool Police Divisional Headquarters - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 46 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school46 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof83 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent97 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Equans Regeneration Limited
Location
Lancashire West Division Police Constabulary, Clifton Road, Lancashire, FY4 4US, United Kingdom
Planning authority
Blackpool
Planning application
23/0271

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/0271, with what the planning evidence pack adds for this site.

Every application in Blackpool · Alerts for applications and incidents near here

  • 17 April 2023 Planning application submitted
  • 5 June 2023 Planning permission granted

None found. The register holds no published incident that names Blackpool Police Divisional Headquarters - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Blackpool Police Divisional Headquarters - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Blackpool Police Divisional Headquarters - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Blackpool Police Divisional Headquarters - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 July 2023.
Where is Blackpool Police Divisional Headquarters - Solar Panels?
4.2 km south of Poulton-le-Fylde, Lancashire, United Kingdom (postcode FY4 4US).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).