← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Cumberland

Moorhouse Farm

Operational5 MWApplication 2/2014/0899Submitted 17 December 2014Granted on appeal 21 March 2016

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
2/2014/0899
Planning authority
Cumberland
County or area
Cumbria
Nation
England
Technology
Solar
Capacity
5 MW
Status
Operational
Operator or applicant
Solar Park Developments
Location
Moor House Farm, Winscales, Workington, CA14 4JZ
Appeal reference
APP/G0908/W/15/3130516
First operating
2016
  • 17 December 2014 Planning application submitted
  • 6 May 2015 Planning permission refused
  • 5 August 2015 Appeal lodged
  • 21 March 2016 Planning permission granted
  • 21 March 2016 Appeal granted
  • 30 August 2016 Construction started
  • 30 November 2016 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2016, Solar panel fire evacuates Hawick High School, 102 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20162022Solar panel fire evacuates Hawick High School102 kmSignificant
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre126 kmMinor
EIR-14992025Solar panels linked to fires at council buildings in Northumberland135 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CA14 4JZ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Cumberland.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.