← Back to East Lothian
Planning pack for this site, £295Other options

Solar · United Kingdom

Haddington Sewage Works, Haddington East - Solar Panels

Operator Scottish Water

Application Submitted0.2 MWData checked 16 November 2026Source record dated 14 May 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Haddington Sewage Works, Haddington East - Solar Panels is a 0.2 MW solar farm on the edge of Haddington, East Lothian, United Kingdom. Its planning application (26/00294/P) went to East Lothian on 2 April 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 6 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

SCOTTISH WATER LIMITED (SC207004), active, since 2000. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Haddington Sewage Works, Haddington East - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 46 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline46 kmMinor
EIR-14762026House fire reported to have started on solar panels in Carnoustie60 kmSignificant
EIR-20162022Solar panel fire evacuates Hawick High School60 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Scottish Water
Location
Haddington Sewage Works Haddington East, East Lothian, EH41 3TE, United Kingdom
Planning authority
East Lothian
Planning application
26/00294/P

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/00294/P, with what the planning evidence pack adds for this site.

Every application in East Lothian · Alerts for applications and incidents near here

  • 2 April 2026 Planning application submitted

None found. The register holds no published incident that names Haddington Sewage Works, Haddington East - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Haddington Sewage Works, Haddington East - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Haddington Sewage Works, Haddington East - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Haddington Sewage Works, Haddington East - Solar Panels?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 14 May 2026.
Where is Haddington Sewage Works, Haddington East - Solar Panels?
On the edge of Haddington, East Lothian, United Kingdom (postcode EH41 3TE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).