← Back to Lothian

Onshore wind · United Kingdom

Townhead Farm

Operator Private Developer

Application Withdrawn6 MWData checked 16 November 2026Source record dated 25 September 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Townhead Farm is a 6 MW wind farm 6.8 km south-east of Haddington, Lothian, United Kingdom. Its planning application (09/00385/FUL) went to East Lothian on 11 May 2009 and was withdrawn on 17 July 2009. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 9 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 409 other sites and 217 energy sites within 40 km for Townhead Farm

Members see the sites and incidents around this one, and every record behind them.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Private Developer
Location
Gifford, Haddington, Lothian. EH41 4PG, Lothian, United Kingdom
Planning authority
East Lothian
Planning application
09/00385/FUL
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 09/00385/FUL, with what the planning evidence pack adds for this site.

Every application in East Lothian · Alerts for applications and incidents near here

  • 11 May 2009 Planning application submitted
  • 17 July 2009 Application withdrawn

None found. The register holds no published incident that names Townhead Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Townhead Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Townhead Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Townhead Farm?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 25 September 2014.
Where is Townhead Farm?
6.8 km south-east of Haddington, Lothian, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).