Battery storage · United Kingdom

Newlands Hill Wind Energy Hub

Operator Belltown Power Limited

Application Submitted136 MWData checked 16 November 2026Source record dated 7 December 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Newlands Hill Wind Energy Hub is a 136 MW battery storage site 13 km south-east of Haddington, East Lothian, United Kingdom. Its planning application (ECU00004603) went to Scottish Government (S36) on 14 November 2023. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 17 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

BELLTOWN POWER UK LIMITED (09677724), active, since 2015. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Newlands Hill Wind Energy Hub sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 276 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool276 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells322 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire465 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
136 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Belltown Power Limited
Location
Lammermuir Hills, Gifford, East Lothian, TD11 3SP, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00004603

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00004603, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 14 November 2023 Planning application submitted

None found. The register holds no published incident that names Newlands Hill Wind Energy Hub. If you know of one, report it (confidential reports are anonymised).

Has Newlands Hill Wind Energy Hub had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Newlands Hill Wind Energy Hub; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Newlands Hill Wind Energy Hub?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 7 December 2023.
Where is Newlands Hill Wind Energy Hub?
13 km south-east of Haddington, East Lothian, United Kingdom (postcode TD11 3SP).