← Back to East Lothian

Solar · United Kingdom

Howden Farm

Operator Howden Eggs

Operational0.2 MWData checked 16 November 2026Source record dated 14 September 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Howden Farm is a 0.2 MW solar farm 6.9 km south of Haddington, East Lothian, United Kingdom. Its planning application (20/00238/P) went to East Lothian on 5 March 2020 and was granted on 27 April 2020. It has been operating since 1 January 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 11 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

247 energy sites within 40 km for Howden Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Howden Eggs
Location
Field To The West Of Howden Wo, Gifford, Haddington, Lothian, East Lothian, EH41 4JS, United Kingdom
Planning authority
East Lothian
Planning application
20/00238/P
First operating
2021

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/00238/P, with what the planning evidence pack adds for this site.

Every application in East Lothian · Alerts for applications and incidents near here

  • 5 March 2020 Planning application submitted
  • 27 April 2020 Planning permission granted
  • 1 January 2021 Operational

None found. The register holds no published incident that names Howden Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Howden Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Howden Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Howden Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 September 2023.
Where is Howden Farm?
6.9 km south of Haddington, East Lothian, United Kingdom (postcode EH41 4JS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).